Projects that prove the scope.
ICWP - Cocoa processing plant
A complete cocoa processing facility combining process integration, buildings, equipment installation and utilities. Thulium coordinated the process requirements with the civil, structural and MEP design so that the plant, the building and the services were engineered as one system.
Process
Buildings
Utilities
Integration scope
Civil & structure
Steam, water, power
PROCESS INTEGRATION
B3C — Cleaning and drying platforms
Process platforms carrying cleaning and drying equipment, engineered for access, maintenance and the loads of continuous operation. The structural design followed the process sequence rather than the reverse.
Platforms
Cleaning
Drying
Structural scope
Process line
Process Line
SITE EXECUTION
Industrial steel construction
Fabrication and erection of industrial steel structures with cladding and envelope works, executed by our own field teams with controlled inspection and lifting plans.
Structures
Cladding
Erection
Fabrication
Envelope
Site works
